Xi Visits Shenzhen–Zhongshan Link as Traffic Passes 81 Million Vehicle Trips

Chinese President Xi Jinping visited the western artificial island of the Shenzhen–Zhongshan Link in Zhongshan, Guangdong province, on November 16, 2026, to inspect the cross-sea route’s construction and operation, Xinhua reported on November 17.

The approximately 24-kilometre link opened for trial operation on June 30, 2024, after seven years of construction. It runs from Shenzhen on the eastern side of the Pearl River estuary toward Zhongshan and Guangzhou’s Nansha district on the western side, combining bridges, islands and an underwater tunnel.

According to Xinhua, the link has carried more than 81 million vehicle trips since opening. It has cut the drive between Shenzhen and Zhongshan from about two hours to about 30 minutes. During the May 2026 holiday, daily traffic exceeded 190,000 vehicles for the first time. Xinhua also cited an estimate that the route eliminates more than 2 billion kilometres of vehicle detours each year.

The report said the link has supported cross-city commuting and public services. By the time of the report, buses operating between Shenzhen and Zhongshan had made a combined 275,000 trips and carried 7.57 million passengers. About 800 government services were available across the two cities, while more than 1,200 could be handled across the Greater Bay Area, according to Xinhua. Trial tourism operations on the western artificial island began in October 2025.