Shandong inquiry confirms weak concrete bases and illegal subcontracting on highway monitoring project

A provincial investigation in Shandong, China, found that some concrete bases for highway monitoring equipment failed to meet design strength requirements and that two contractors had illegally subcontracted work. In a November 27, 2026, statement, the joint investigation team said disciplinary and supervisory authorities had held six organizations and 17 people accountable.

The project, led by Shandong Hi-Speed Information Group, calls for 5,000 high-precision monitoring units at hazardous slopes and bridges along roads including the Jinan–Weifang Expressway. The units are part of a network designed to detect settling and deformation. In June 2026, journalists reported finding weak concrete bases at some sites and questioned whether work had been subcontracted illegally.

Four nationally accredited independent testing organizations deployed 115 teams to inspect all 5,000 monitoring sites. Inspectors found concrete with voids and pitted surfaces, as well as bases that fell short of the required strength. The statement did not specify how many bases were defective.

A separate panel of 31 experts reviewed project management. It found that Shandong Hi-Speed Information Group had failed to fulfill its responsibilities as project owner, the design lacked sufficient detail, and supervision and testing were perfunctory. Investigators identified Guangdong Jiayi Engineering and Shandong Bainian Huitong Engineering Technology as the contractors responsible for illegal subcontracting and inadequate construction quality control.

Sanctions included Communist Party warnings and administrative demerits. Two former executives at Guangdong Jiayi were removed from their administrative posts; one also lost a Party post and the other was expelled from the Party. The team said those sanctions also reflected other violations. Separately, authorities imposed administrative penalties of varying amounts on nine organizations and 13 people under construction design and quality regulations.

The team said all defective bases at slope sites had been repaired and the concrete at those sites now met design strength requirements. The project remained under construction and had not undergone final acceptance inspection. The team said authorities would organize that inspection and carry out a provincewide review to identify and correct construction quality problems.